Work has continued apace this past week.   

When I arrived this afternoon work to widen the stairwell down to the boiler room was well underway.  The old steps had been dug out down to the level of the boiler room floor, and the new retaining wall was being built.  This will widen the access to the new plant room making it easier and safer to access the GSHP. 
   
 And (big Hurrah!) the borehole is now 115m deep and a good water supply has been established!  The borehole has been lined and the well was being cleaned when I was there today.

Tomorrow drilling begins on the second borehole which will also be located in the north car park (in the rather unprepossessing photo below, the second borehole will be roughly where the pile of mud is!) 
 