High

A head for heights needed today as the boys were up in the cherry pickers putting the first coat of paint on the tower – just look at the difference! And the scaffolding is back on the north side to enable some much needed roof repairs.  Thanks to Sam for the pictures of the roof.

 

20121108-090819.jpg

This entry was posted in Project Updates and tagged , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *