Monthly Archives: January 2016

Radio Interview

Paul was interviewed on BBC Radio Berkshire this morning talking about the project and life at St George’s beyond George Goes Green. If you want to have a listen copy and paste the following link to your web browser then … Continue reading

Posted in Project Updates | Tagged , | Leave a comment

80 Metres And Counting

Even though it’s been bright and dry today, when I called by on the afternoon school run, Baz was pouring muddy water out of his hard hat.  ‘We hit water!’ he grinned – but not the aquifer just yet.   … Continue reading

Posted in Project Updates | Tagged , | Leave a comment

Glorious Mud

Site was a mud bath this afternoon, but they’re down to 62m despite the weather.        

Posted in Project Updates | Tagged , | Leave a comment

Drilling

So loud was the clanking and rattling from the boring machine this morning, that we conversed mostly in semaphore.  The photos today show the drilling continuing, fresh water being poured into the reservoir and trenches and a visit from the … Continue reading

Posted in Project Updates | Tagged , | Leave a comment

A little bit about ground source heat…

The boring machine was whirring and rattling away on Thursday when I stopped by to take some photos and introduce myself to the guys on site. Nick and Baz very kindly gave me a little tour of the boring machine … Continue reading

Posted in Project Updates | Tagged , | Leave a comment